The Fairburn project involved the installation of a 13km pipeline of varying diameters, delivered through a combination of Horizontal Directional Drilling (HDD) and open-cut methods. The works included the installation of both sticks and coils, requiring careful planning and coordination to maintain efficiency and safety throughout the project.
This scheme was essential to improve water network reliability and ensure continued service for local communities, while minimizing disruption to existing infrastructure and the surrounding environment.
Pipeline Length: 13km
Installation Methods: HDD and open-cut
Pipe Diameters: Various sizes
Coordinating long-distance pipeline installation across mixed terrain.
Managing HDD works safely and effectively.
Minimizing disruption to local communities and existing utilities.
Logistics of handling sticks and coils over an extended route
Successfully installed a 13km pipeline on schedule
Combined HDD and open-cut installation methods to overcome terrain and environmental challenges.
Maintained a high level of safety and environmental compliance throughout.
Efficient project management ensured minimal impact to local areas and landowners.